A tender response summary from a fit-out contractor

A fit-out contractor summarises its bid to refurbish two floors of a client's head office, so the panel sees the main points before reading the full submission.

Sent by
A fit-out contractor
Written for
A professional services firm
Document
Tender summary
Interactive parts
A price chart with values on hover
The top of the document on a laptop

Inside the document

These are screenshots of the published page. Pick a part to see it.

Screenshot: Requirements and our response
Screenshot: Pricing summary
Screenshot: Key dates

The brief

The full submission runs to many pages. This summary gives the panel the main points and says where each answer sits in the full bid.

Panel members can open it on any device before the evaluation meeting.

Background

BSI's PAS 91 set out a standard list of the questions typically asked of suppliers at the prequalification stage of construction tendering, and BSI lists it as withdrawn since April 2023.1

Under the Construction (Design and Management) Regulations 2015, the Health and Safety Executive explains, a principal contractor is appointed by the client to control the construction phase of any project with more than one contractor.2

  1. BSI, PAS 91 construction prequalification questionnaires
  2. Health and Safety Executive, CDM 2015 principal contractors
The same document on a phone
Previous exampleA sell-side process plan for a business ownerBack toAll examples

Apply for an account

We set up each account by hand around your branding and the documents you send, so we take on a small number of firms at a time.

Apply now